Solar & Battery Storage Construction
Circet Energy combined solar PV installation with the full construction of a connected BESS for Enel Green Power in Trino, Italy, including electrical connections and fire suppression system integration and commissioning.

PROJECT SNAPSHOT

Customer
Enel Green Power
Location
Trino Vercellese, Vercelli province, Piedmont, Italy
Solution
Renewables & Storage Systems
SCOPE
Solar PV installation and full civil and electromechanical construction of the connected BESS
25 MW
BESS power
120 MWh
storage capacity
90.22 MWp
Solar installed capacity
THE CHALLENGE
Enel Green Power’s Trino solar park transformed a historic industrial brownfield into a large-scale renewable energy facility. The challenge was to deliver a ground-mounted PV installation and a connected BESS on this complex site, combining solar installation, electrical connections, full BESS construction and fire suppression integration.




Our approach
Combining solar installation and battery storage
Solar PV installation and connections
We installed the support structures, panels and inverters for the ground-mounted PV plant, together with low-voltage (LV) and medium-voltage (MV) connections. This formed one of the Circet Energy Italian teams’ largest PV installations.
Full construction of the connected BESS
We carried out the full civil and electromechanical construction of the battery storage facility connected to the solar plant. The BESS works used equipment supplied by Enel Green Power.
Fire suppression integration and commissioning
Our scope also included integration and commissioning of the fire suppression system. These safety-critical activities formed part of the combined delivery of the solar PV and battery storage facilities.